Spread Silverlight Documentation
Evaluate(Object[]) Method


The args contains 2 - 3 items: start_date, end_date, [method].

Start_date is a date that represents the start date.

End_date is a date that represents the start date.

[Method] is a logical value that specifies whether to use the U.S. or European method in the calculation.

Returns the number of days between two dates based on a 360-day year (twelve 30-day months), which is used in some accounting calculations.
Syntax
'Declaration
 
Public Overloads Overrides Function Evaluate( _
   ByVal args() As System.Object _
) As System.Object
'Usage
 
Dim instance As CalcDays360Function
Dim args() As System.Object
Dim value As System.Object
 
value = instance.Evaluate(args)
public override System.object Evaluate( 
   System.object[] args
)

Parameters

args

The args contains 2 - 3 items: start_date, end_date, [method].

Start_date is a date that represents the start date.

End_date is a date that represents the start date.

[Method] is a logical value that specifies whether to use the U.S. or European method in the calculation.

Return Value

A System.Int32 value that indicates the evaluate result.
Requirements

Target Platforms: Windows 7, Windows 8 Desktop, Windows Vista SP1 or later, Windows Server 2000, Windows 2000 Professional, Windows XP Professional, Windows NT 4.0 Workstation, SP6, Windows NT 4.0 Server, SP6

See Also

Reference

CalcDays360Function Class
CalcDays360Function Members
Overload List

 

 


Copyright © GrapeCity, inc. All rights reserved.